Eggborough Power Station – DSM Demolition Ltd

PPS Metal Recycling (PPS) were appointed by DSM Demolition Ltd (DSM) as a sub‐contractor for associated works at their site of Eggborough Power Station. PPS undertook the following works:
  • Dismantle and Processing of Large and Small Transformers.
  • Clearance of re‐usable pipe work
  • Internal Strip‐out of stores
  • Dismantle and lifting operations for the Alternator within the Turbine Hall.
  • Dismantle and lifting operations for the Pump House including the removal of overhead gantry crane
  • Purchasing of ferrous and non‐ferrous metals. /li>
Works were undertaken in a phased sequence under programme timescales. All co‐ordination between PPS and DSM on a regular basis.
  • Project Duration: August 2019 – February 2022 (Phased Works)
  • Contract Value: Between £2.5m ‐ £3.0m

Key Site Constraints and Challenges:

  • Working in co‐ordination with ongoing site works.
  • Residual COSHH present within units.
  • Fire Risk and Hot Work Operations.
  • Working at Height
  • Heavy Industrial Dismantle
  • Lifting Operations
  • Heavy Haulage

Achievements:

  • Works completed on time and within budget.
  • Repeat works with DSM after the completion of each phase